IMO Net-Zero Framework
The IMO Net-Zero Framework remains an unadopted draft: MEPC 84 arranged further work toward MEPC 85 and possible resumption on 4 December 2026, not finalized detailed guidelines.
Operational Explanation
The IMO Net-Zero Framework remains an unadopted draft: MEPC 84 arranged further work toward MEPC 85 and possible resumption on 4 December 2026, not finalized detailed guidelines.
Regulatory Reference
MEPC 83 approved draft; MEPC/ES.2 adjourned October 2025; MEPC 84 outcome.
Scope of Application
Thresholds, timetable, RU prices and supporting guidelines remain draft/open to amendment.
Procedure / How to Complete It
- Label every parameter draft/under negotiation.
- Do not use binding, has set or adopted before the act.
- For scenario analysis: draft RU Tier 1 USD100 and Tier 2 USD380/tCO2e, 2028–2030.
- Do not use prices as guaranteed liability.
- Update after MEPC 85/ES.2.
Practical Example
A charter scenario may model USD100/380 with sensitivity and a draft disclaimer, not as an operative price.
What Typically Goes Wrong
Writing MEPC 84 approved detailed implementation guidelines or prices have been set.
Common Mistakes Mistake Library
| Mistake | Consequence | How to Avoid It |
|---|---|---|
| Writing MEPC 84 approved detailed implementation guidelines or prices have been set. | Non-compliant decision or treatment | Follow the approved arrangement and applicable sources |
What the PSCO Checks
Operational Tips
- Separate current requirement, class/maker, SMS and voluntary guidance.
- Do not improvise tests, thresholds or intervals.
- Record deviations and corrective action.
Preparation checklist
- Draft status
- No binding date
- RU draft labelled
- Scenario only
- Update gate