Turnaround Operations: Managing Simultaneous Operations in Port
SIMOPS is a company method that may be integrated into the SMS: authority, interfaces and stop-work responsibility must be clear, while role titles, toolbox talks and ALARP depend on the adopted framework.
Operational Explanation
No dedicated IMO turnaround rule mandates a SIMOPS Leader, toolbox talk or ALARP criterion. These are possible company controls to use where prescribed by the SMS and Company risk-management framework.
Regulatory Reference
There is no single IMO regulation dedicated to passenger ship turnaround: the SIMOPS (Simultaneous Operations) discipline is a risk management framework, referenced by industry guidelines (including IMCA and ABS Group for the maritime/offshore sector) and integrated into the Safety Management System (SMS) required by the ISM Code for managing multiple, potentially conflicting activities in the same place and time.
Scope of Application
Turnaround and simultaneous activities managed under the SMS, port procedures and applicable law. The responsible person may be a designated coordinator or another person identified by the SMS; the title is not universal.
Procedure / How to Complete It
- Map activities, interfaces and potential conflicts.
- Assign authority, coordination and stop-work responsibility under the SMS.
- Use toolbox talks, a SIMOPS matrix or dedicated coordinator where prescribed or selected by the Company.
- Reduce risk to the level required by the company framework and law; use ALARP only when formally adopted.
Practical Example
Example: during the turnaround day, the designated Simultaneous Operations Leader identifies that the scheduled bunkering overlaps with the start of passenger embarkation operations on the same side of the ship, and reorganises the sequence of activities to eliminate the physical interference between the two operations before authorising them.
What Typically Goes Wrong
Common Mistakes Mistake Library
Recurring errors are leaving interfaces unassigned or imposing names and controls absent from the SMS. Identify the responsible person, stop-work authority and the risk criterion actually applicable.
What the PSCO Checks
Operational Tips
- Map potential interferences between turnaround activities before the day itself, not during operations.
- Always designate a Simultaneous Operations Leader with clear authority, not a diffuse and implicit responsibility.
- Communicate every delay along the turnaround chain immediately: the cascading effect on a compressed day is faster than it seems.
Preparation checklist
- Interferences mapped
- Authority and interfaces assigned
- Stop-work responsibility clear
- Controls match SMS
- Applicable risk criterion identified
FAQ
Related Topics