SuperbaKnowledge Demonstration release
Platforms
ENIT
Operational guide · Operational procedure

Damage Stability of Ro-Ro Passenger Ships (SOLAS 2020)

SOLAS 2020 applicability follows three alternative triggers; regular services to or from EU ports also engage Directive 2003/25/EC as amended by Directive (EU) 2023/946.

SOLAS 2020damage stabilityRo-Ro passenger shipsStockholm Agreement

Operational Explanation

SOLAS 2020 is determined by three alternative triggers: building contract from 1 January 2020; absent a contract, keel/similar stage from 1 July 2020; delivery from 1 January 2024. For regular services to or from EU ports, SOLAS and the EU regime apply cumulatively under the relevant limb, not as a binary choice.

Regulatory Reference

SOLAS Chapter II-1, SOLAS 2020 amendments, adopted by resolution MSC.421(98) of 15 June 2017 and in force since 1 January 2020: increase in the required subdivision index (R) and recalculation of the survival factor (s-factor) for flooding scenarios in the vehicle spaces/large open spaces of Ro-Ro passenger ships, at a global standard level comparable to the 1996 Stockholm Agreement. Regulation II-1/1 on application was amended by res. MSC.436(99) of 24 May 2018, also in force from 1 January 2020: the two resolutions must be cited together. The test for application is the one in regulation II-1/1.1.1, and there are three alternative conditions: “for which the building contract is placed on or after 1 January 2020”; or, in the absence of a contract, “the keel of which is laid… on or after 1 July 2020”; or “the delivery of which is on or after 1 January 2024”. Any one of them suffices. And the regime is not confined to ro-ro ships: it applies to all passenger ships, and to cargo ships of 80 m in length and upwards for regulations 6 to 7-3.

Scope of Application

Check all three SOLAS triggers. For the EU regime distinguish new/existing ship, service after 5 December 2024, any prior certification under the Directive and capacity above or not above 1,350 persons.

Procedure / How to Complete It

  1. Test building contract, keel/similar stage and delivery; one relevant trigger is sufficient.
  2. Apply the resulting international SOLAS regime.
  3. For regular EU-port service classify new/existing, entry date, prior certification and 1,350 threshold.
  4. Apply the amended Directive 2003/25/EC limb without reducing it to the original Stockholm Agreement.

Practical Example

A ship delivered on 10 January 2024 meets the delivery trigger even if the other dates are earlier. If entering regular EU service, also determine the EU limb from status, date, prior certification and capacity.

What Typically Goes Wrong

The MV Estonia disaster, in which the loss of the bow visor caused rapid flooding of the vehicle deck and the sinking of the ship with the loss of more than 850 lives, remains the reference case that motivated both the 1996 Stockholm Agreement and, more than two decades later, the global raising of the standard with SOLAS 2020.

Common Mistakes Mistake Library

MistakeConsequenceHow to avoid it
Applying the operational load limits of a sister ship with a different keel-laying date, assuming the stability regime is identicalExceeding the specific ship's real operational limits, with a reduced damage stability safety marginAlways verify the applicable stability regime based on your own ship's specific keel-laying date, not that of a sister ship
Structural modifications to vehicle spaces not followed by a reassessment of the damage stability calculationStability documentation no longer representative of the ship's actual configurationAlways reassess the stability calculation in the event of structural modifications that alter the subdivision or vehicle spaces

What the PSCO Checks

Port State Control Officers (PSCOs) may check the consistency between the damage stability documentation on board, the regime applicable based on the ship's keel-laying date, and the operational limits actually observed in load distribution.

Operational Tips

Preparation checklist

FAQ

Does keel date alone determine the regime?
No. Contract, keel/similar stage and delivery are alternative triggers.
Did SOLAS 2020 replace the EU regime?
No. Services within the Directive also follow the applicable EU limb.

Related Topics

Last substantive revision of this page: 19 August 2026 · page fingerprint 885acc09f4bf