Hong Kong Convention: Inventory of Hazardous Materials and Green Passport
HKC follows flag/authority scope and exclusions: existing ships complete IHM Part I and initial survey/certification by 26 June 2030 or before recycling; there is no universal first harmonized renewal trigger.
Operational Explanation
HKC follows flag/authority scope and exclusions: existing ships complete IHM Part I and initial survey/certification by 26 June 2030 or before recycling; there is no universal first harmonized renewal trigger.
Regulatory Reference
Hong Kong Convention, in force 26 June 2025; MEPC.222(64); separate EU SRR 1257/2013 Articles 11–12.
Scope of Application
Ships flying a Party flag/under its authority subject to express exclusions, not a generic international-voyage test. Arrange HKC survey with Administration/authorized organization.
Procedure / How to Complete It
- Determine HKC flag/authority scope and exclusions.
- Keep EU-flag/third-country EU-port regime separate.
- Prepare IHM Part I and initial certification by 26 June 2030 or earlier recycling.
- Do not rely on ordinary HSSC renewal to issue ICIHM.
- For PSC present documents legally due on inspection date, not voluntary progress.
Practical Example
An existing in-scope ship schedules HKC initial survey before 2030; an EU-port call may already trigger separate EU SRR documents.
What Typically Goes Wrong
Limiting HKC to international voyages, using first harmonized renewal as trigger, or treating progress toward ICIHM as an autonomous PSC requirement.
Common Mistakes Mistake Library
| Mistake | Consequence | How to Avoid It |
|---|---|---|
| Limiting HKC to international voyages, using first harmonized renewal as trigger, or treating progress toward ICIHM as an autonomous PSC requirement. | Non-compliant decision or treatment | Follow the approved arrangement and applicable sources |
What the PSCO Checks
Operational Tips
- Separate current requirement, class/maker, SMS and voluntary guidance.
- Do not improvise tests, thresholds or intervals.
- Record deviations and corrective action.
Preparation checklist
- Flag/authority scope
- Exclusions
- 2030 deadline
- Survey arranged
- EU SRR separate
- PSC due-now documents
FAQ
Related Topics