ECDIS (Electronic Chart Display and Information System)
Carriage requirement, back-up arrangement and ENC updating: the most common errors that turn ECDIS from a safety tool into a source of PSC deficiencies.
Operational Explanation
When ECDIS fulfils the chart-carriage requirement, it must be used with updated ENCs, route-appropriate alarms and an adequate back-up arrangement. STCW ECDIS competence does not replace documented familiarisation with the installed equipment and configuration.
Regulatory Reference
SOLAS V/19.2.1.4 and V/19.2.10: where chart-carriage functions are met partly or entirely by electronic means, the configuration must include an adequate back-up arrangement approved by the Administration. STCW governs ECDIS competence; familiarisation, its documentary form and any type-specific course depend on the Administration and the SMS.
Scope of Application
The carriage requirement follows ship type, size and date. Voluntary ECDIS used only as an aid, while a complete and updated paper portfolio remains the compliant primary means, does not automatically enter the ECDIS back-up regime.
Procedure / How to Complete It
- Identify which means fulfils the chart-carriage requirement in the ship's approved configuration.
- If it is ECDIS, verify ENCs, updates, alarms and the approved back-up; paper charts qualify only when complete, updated and accepted as part of that configuration.
- Verify officers' STCW competence and document familiarisation with the installed equipment, software, sensors and back-up.
- Require a type-specific course or certificate only where the Administration or SMS does so.
Practical Example
Example pre-departure check: "Primary ECDIS updated with ENCs valid as of 2026-07-08; back-up arrangement verified (second ECDIS on independent power supply); anti-grounding alarms configured for the planned route to Genoa."
What Typically Goes Wrong
Common Mistakes Mistake Library
| Mistake | Consequence | How to avoid it |
|---|---|---|
| ENCs not updated or subscription expired | Navigation with outdated chart data, PSC deficiency | Systematically verify ENC update status before every departure |
| Anti-grounding alarms disabled to reduce false alarms | Loss of ECDIS's main safety function | Correctly configure alarm thresholds for the specific route, don't disable them |
| Back-up arrangement not working or not periodically verified | No redundancy in case of primary ECDIS failure | Periodically test the back-up arrangement as part of onboard checks |
| Generic crew training, not specific to the installed ECDIS model | Incorrect use of the system's specific safety functions | Ensure type-specific training covers the ECDIS model actually installed on board |
What the PSCO Checks
Operational Tips
- Never disable anti-grounding alarms for convenience: adjust the thresholds correctly instead.
- Check ENC subscription status before every departure, not just periodically.
- Make sure type-specific training actually covers the ECDIS model installed on board, not a generic model.
Preparation checklist
- Primary chart-carriage means and approved configuration identified
- ENCs and back-up checked where ECDIS fulfils the requirement
- Route alarms configured
- STCW competence verified
- Familiarisation with installed equipment documented under SMS/flag requirements
FAQ
Related Topics
Last substantive revision of this page: 19 August 2026 · page fingerprint 4fc2b83f7309