Break Bulk Cargo: Stowage, Dunnage and Damage Prevention

For break bulk, weight, dimensions and centre of gravity come from reliable data and are verified according to risk; the evidence package follows cargo and contract and does not require draft surveys at every stage.

break bulkdunnagestowagecargo claim

Operational Explanation

Break bulk cargo (non-containerised general cargo: steel coils, timber, bagged goods, pallets, machinery) requires piece-by-piece stowage planning, different from the logic applied to standardised container or bulk units. Dunnage (separation and weight-distribution material, typically timber) must be placed under the cargo to provide uniform surfaces and distribute the weight, avoiding exceeding the maximum permissible load on the tank tops.

Stowage and securing shortcomings are among the most frequent causes found in investigations into break bulk damage: the ship's approved Cargo Securing Manual must always be followed, with documentation of the dunnage standard used and continuous supervision of the handling carried out by the stevedores.

Regulatory Reference

There is no single IMO code dedicated to general break bulk cargo; the ship-specific approved Cargo Securing Manual and the general principles of the CSS Code apply, supplemented by documented industry practices (P&I Club, IIMS) on stowage, dunnage and damage prevention.

Scope of Application

Every ship carrying non-containerised general cargo (break bulk), including bulk carriers with mixed cargoes, with the crew responsible for verifying stowage and documentation during operations.

Procedure / How to Complete It

  1. Obtain and verify reliable weight, dimensions and centre-of-gravity data for each item as required for safe stowage and securing.
  2. Require competent engineering assessment where data, shape, supports or risk do not permit ordinary verification.
  3. Plan stowage, dunnage, supports, access and securing under CSM and ship limits.
  4. Document tally, apparent condition, mate's receipts/reservations, photographs and condition reports.
  5. Use draft survey only where an appropriate and agreed quantity-measurement method.

Practical Example

Example: during the loading of steel coils, the crew checks the weight and centre of gravity of each coil before positioning it, applies timber dunnage of adequate thickness to distribute the load on the tank top, and photographically documents the completed stowage before closing the holds.

What Typically Goes Wrong

P&I Club investigations into break bulk cargo claims repeatedly identify over-stowage (excessive weight accumulated on the lower layers) and inadequate dunnage as the main causes of damage, often combined with an imprecise tally that makes it difficult to demonstrate the actual condition of the cargo at loading in the event of a subsequent dispute.

Common Mistakes Mistake Library

MistakeConsequenceHow to avoid it
Stowage planning without a piece-by-piece calculation of weight, dimensions and centre of gravityCargo instability and risk of damage during transportAlways plan break bulk stowage piece by piece, not by analogy with standardised cargoes
Over-stowage of the cargo, with accumulated weight that the lower layer cannot supportDamage to the cargo in the lower layer during transportAlways verify the load-bearing capacity of the lower layer before adding further layers on top
Imprecise cargo tally, especially for bagged goodsInability to demonstrate the actual condition of the cargo at loading in the event of a cargo claimCarry out an accurate, documented tally for every type of break bulk cargo, particularly bagged goods

What the PSCO Checks

Break bulk cargo is not typically subject to direct PSC verification of its specific stowage, but the 2026 Concentrated Inspection Campaign on Cargo Securing includes a general check of cargo stowage and securing procedures.

Operational Tips

Preparation checklist

FAQ

Must crew empirically calculate every item's CoG?
No. Obtain and verify reliable shipper/manufacturer data and require engineering assessment where necessary.
What evidence package supports a cargo claim?
It follows cargo and contract: accurate tally, mate's receipts and reservations, photographs, condition reports and any required independent survey.
Are repeated draft surveys required at every stage?
No. Use them only where an appropriate and agreed method for measuring cargo quantity.