Heavy Lift Cargo and Project Cargo
For heavy lift and project cargo, reliable data, supports and securing must match the CSM and ship limits. Annex 13 also assists competent ship’s staff in assessing arrangements outside the manual; calculations, acceptance and checks follow the particular case.
Operational Explanation
For project cargo, connect mass and centre of gravity with the selected position, reactions at individual supports and the load path into the ship’s structure. The CSM, relevant drawings and calculations then allow the installed supports, devices and securing to be compared with the assessed arrangement. Stability, deck or tank-top limits, load-spreading grillage and sea fastening must be considered together.
Annex 13 provides design assumptions and assessment methods for semi-standardised and non-standardised cargo. Sections 2.2–2.3 envisage use by both ship’s staff and qualified shore personnel for cargo outside the CSM. Competence, reliable data and an appropriate method are needed: citing the Annex does not replace structural checks or the acceptance or approval process required for the case. Very heavy or large items may need considerations beyond the general method.
Regulatory Reference
SOLAS VI/5.6; MSC.1/Circ.1623 — CSS Annex 13. The approved CSM and engineering package govern securing. Operational procedures for weather-dependent securing must be documented in the approved CSM or SMS under Annex 13 §7.1.6, consistently with applicable limits. A forecast alone does not authorize arbitrary design-load reductions.
IMO — SOLAS II-1/3-13, effective 1 January 2026. Separately verify applicable lifting-appliance requirements: design, operation, inspections, testing and maintenance. A lifting plan does not replace sea-fastening design, or vice versa.
Scope of Application
Heavy lift, out-of-gauge and project cargo require assessment proportionate to mass, geometry, supports, CoG, structure and voyage. Approval/acceptance and independent survey depend on Administration, class, CSM, Company, contract, charterer or insurer; they are not identical universal IMO duties for every cargo.
Procedure / How to Complete It
- Obtain reliable mass, dimensions, verified CoG, support and lifting points from the shipper.
- Check deck/tank-top limits, stability, structural loads and compatibility with the approved CSM.
- Have competent personnel prepare securing/sea-fastening analysis under Annex 13 and other applicable standards.
- Obtain acceptance/approval and survey where required by documents and competent parties.
- On board verify installation against drawings and calculations; stop on discrepancy.
Practical Example
For a turbine on deck, the engineering package checks supports, grillage, deck loads, stability, design accelerations and sea fastening. Weather or speed limits apply only if formally included. Crew verify installation against accepted drawings.
What Typically Goes Wrong
Dividing weight by the whole deck area hides concentrated support reactions. Competent engineering must check load paths, grillage and supporting structure. Lifting points are not automatically suitable as securing points: directions and capacities must be checked for each use.
Common Mistakes Mistake Library
| Mistake | Consequence | How to Avoid It |
|---|---|---|
| Improvised onboard Annex 13 calculation | Securing not demonstrated against cargo data, structural limits or voyage conditions | Use competent personnel, an appropriate method and data; complete required checks and acceptance or approval |
| Forecast freely reduces design loads | Arrangement falls outside approved assumptions | Use weather-dependent limits only where formally prescribed |
| Independent survey treated as universal IMO duty | Requirement unsupported by the source | Check contract, insurer, Company, class and Administration |
What the PSCO Checks
Operational Tips
- Do not use estimated data where mass or CoG requires verification.
- Do not reduce design loads from forecast alone.
- Check the sea-fastening survey requirement in contract and applicable procedures.
Preparation checklist
- Reliable cargo data and verified CoG
- Deck/tank-top, stability and structural loads checked
- Engineering analysis prepared by competent personnel
- Acceptance/approval obtained where required
- Weather-dependent limitations formally documented
- Need for independent survey assessed; carried out when required or selected based on risk
- Installation matches drawings
FAQ
Related Topics
Certified substantive revision: 15 October 2026 · page fingerprint daed586b5b19