Operational guide · Safety & equipment

Boiler Operations

Boiler protections and safety valves are tested only at intervals and by methods, authorisations, personnel and precautions prescribed by maker, PMS/SMS and flag/class; no improvised live lifting test.

boilerauxiliary boilerSOLAS II-1pressure

Operational Explanation

Boiler protections and safety valves are tested only at intervals and by methods, authorisations, personnel and precautions prescribed by maker, PMS/SMS and flag/class; no improvised live lifting test.

Regulatory Reference

SOLAS II-1/26, approved boiler arrangement, maker instructions and flag/class survey requirements.

Scope of Application

Routine crew inspection, PMS functional test and statutory/class survey are distinct activities.

Procedure / How to Complete It

  1. Check condition, alarms and protections under watch/PMS.
  2. Schedule functional/set-pressure tests only by approved method.
  3. Use competent personnel/surveyor and authorisation where prescribed.
  4. Do not lift, gag, adjust or defeat a safety valve as an improvised check.
  5. Record surveys, tests and defects separately.

Practical Example

A live-steam set-pressure test is performed only in an authorised window with required procedure, precautions and personnel; routine watch checks do not replace it.

What Typically Goes Wrong

Always ordering a safety-valve test under actual working conditions or confusing crew inspection with statutory internal inspection.

Common Mistakes Mistake Library

MistakeConsequenceHow to Avoid It
Always ordering a safety-valve test under actual working conditions or confusing crew inspection with statutory internal inspection.Non-compliant decision or treatmentFollow the approved arrangement and applicable sources

What the PSCO Checks

Evidence of the approved arrangement, procedures, records, competence, defect management and consistency with statutory/class/maker requirements.

Operational Tips

Preparation checklist

FAQ

Must the valve always be lifted under steam?
No. Only when expressly authorised and controlled.
Are routine and survey inspections the same?
No. Their scope, competence and records differ.