Engine-room measures can contribute to CII and SEEMP, but the choice must be demonstrated across the whole energy system: engine load, heat recovery and electrical generation have no universal outcome.

energy efficiencywaste heat recoveryshaft generatorCII

Operational Explanation

The engine room contributes to energy management through measurement, operation and maintenance of machinery. It works with the bridge and technical office: speed, route, sea conditions and required services determine load, including when commercial decisions are taken elsewhere. The Environmental Compliance module covers SEEMP Part II/III and CII in more detail; this page assesses how the plant meets propulsion, electrical and heat demand.

Waste heat recovery recovers exhaust-gas heat for thermal services or generation, according to the installed plant. A shaft generator in PTO mode produces electricity by taking power from the main engine: it can replace part of auxiliary generation, but adds demand on the engine. The choice requires the overall energy balance, actual load and plant limits; availability alone does not demonstrate a saving.

When reading performance, distinguish fuel consumption, engine-specific fuel consumption in g/kWh and shaft power in relation to speed through water. Measured power depends on the point in the transmission and the power take-offs present: do not assume that power at the propeller always represents the engine’s entire output. A normalized power–speed trend can support a hull/propeller investigation; higher g/kWh also requires checks of the engine and measurements.

Regulatory Reference

MARPOL Annex VI, chapter 4: Regulation 26 addresses the SEEMP and Regulation 28 the annual operational CII for ships within scope. The rules measure and manage performance; they do not universally prescribe waste heat recovery or a shaft generator. Specific measures follow the SEEMP, installed arrangement, maker and technical assessment.

SEEMP guidance on hull, propeller and engine maintenance and heat recovery supports coordinated assessment. Set comparison conditions and responsibilities for each measure, measure the result and review effectiveness. IMO SEEMP, Part I: MEPC.395(82), MEPC.401(83), MEPC.413(84); MEPC.1/Circ.925 (2026).

Scope of Application

For obligations, distinguish, within the scope of MARPOL Annex VI chapter 4, SEEMP Part I for ships of 400 GT and above, Part II and DCS data collection from 5,000 GT and Part III/CII from 5,000 GT for the ship categories specified in the relevant provisions. Tonnage alone does not establish that all these obligations apply; check ship type, exclusions and applicable documents.

The technical assessment concerns the installed plant and operating profile: sea passage, manoeuvring and port can have different energy demands. It also remains useful outside CII where included in Company energy management. It does not prescribe retrofits, setpoints, switching sequences or saving percentages.

Procedure / How to Complete It

  1. Define demand and the baseline. Identify the period, configuration, propulsion and electrical/thermal services to maintain. Choose a metric that answers the question: total ship consumption, one engine’s performance or power required at a given speed.
  2. Check measurements. Record the source, units, common time interval, measurement point and included consumers. Check relevant instrument availability, calibration and maintenance; distinguish measured, estimated and missing data and document any corrections.
  3. Make data comparable. Consider load, speed of rotation, fuel, draught, trim, speed through water, wind/sea conditions and service demand. Use the ship’s comparison method; if factors cannot be controlled, state the limitation instead of immediately assigning a cause.
  4. Choose a measure that can be verified. Assess engine and generator loads against maker curves and limits, machinery maintenance and thermal losses. For heat recovery and shaft generation, compare total fuel and useful services, including losses and demand transferred between units.
  5. Agree and implement within the authorized scope. Set the responsible person, operating conditions and verification criteria in the SEEMP/SMS process. Respect service continuity, reserves, protections, standby arrangements and approved limits: an energy assessment does not authorize their exclusion. Carry out actions according to ship procedures.
  6. Verify the outcome and follow it up. Compare before/after under comparable conditions, recording the result, data quality and abnormalities. Also record an unimplemented measure and the reason. Decide whether to retain, modify or reassess the measure and who follows its effectiveness; link defects and work to the PMS and relevant data to the SEEMP.

Practical Example

At the same speed through water and under comparable conditions, required shaft power increases. The team checks measurements, draught, trim, weather and propulsion condition; it proposes a hull/propeller inspection if the data support that hypothesis. An increase in engine g/kWh also requires investigation of engine condition and fuel measurement: it does not by itself establish fouling.

What Typically Goes Wrong

Assessing one unit’s savings without the ship’s energy balance can hide increased consumption elsewhere. Lower specific consumption does not guarantee a better annual CII: total consumption and ship activity over the period also matter.

Common Mistakes Mistake Library

MistakeConsequenceHow to avoid it
Main engine operated at very low loads for long periods without assessing consumption, conditions and maker limitsEngine performance or condition may deteriorate; the trend alone does not explain annual CIICompare data and curves under relevant conditions; report deviations and agree follow-up with the bridge and technical office
Prioritizing heat recovery or shaft generation solely because they are availableSavings on one unit may be cancelled by higher consumption or inadequate services elsewhereCompare the whole balance and services maintained, within plant limits and required reserves
Using higher engine g/kWh as proof of hull/propeller foulingDiagnosis and intervention may address the wrong causeDistinguish specific consumption from the normalized power–speed trend; check measurements and conditions before proposing an inspection
Comparing consumption for different periods, units or consumersAn apparent saving may result from an invalid comparisonState the boundary, units, interval and data quality and correct the comparison before deciding

What the PSCO Checks

Check availability and consistency of applicable MARPOL Annex VI documentation, including SEEMP and the DCS/CII Statement of Compliance where required. Do not categorically exclude checks of equipment condition and operation; the PSCO does not prescribe a universal preference for shaft generation or heat recovery.

Operational Tips

Preparation checklist

Educational checklist. This summary supports learning and preparation only. It does not replace the vessel’s approved procedures, manuals, statutory documents, company SMS, or applicable official requirements. Completing it demonstrates neither compliance nor readiness for an inspection: it shows that a list has been read, not that the ship is in order. Always verify the current documents carried on board.

FAQ

Does this page replace the SEEMP?
No. It describes technical levers to evaluate and document in the applicable process.
Does a shaft generator always reduce fuel use?
No. Compare the whole-system balance under actual operating conditions.
Does higher consumption prove fouling?
No. It is a signal to normalize and investigate with other factors.