SuperbaKnowledge Demonstration release
Platforms
ENIT
Operational guide · Safety & equipment

Integrated Automation Systems and Unmanned Machinery Space (UMS)

UMS allows periods with machinery spaces unattended when the approved arrangements, plant condition and watchkeeping arrangements permit. Automation monitors and signals; the designated engineer officer remains on call and ready to respond.

UMSautomationSOLAS II-1periodically unattended machinery space

Operational Explanation

UMS means periodically unattended machinery spaces. The ship must retain safety equivalent to the attended arrangement. The absence of continuous personnel in the space does not end the engineering watch or transfer all machinery responsibilities to the bridge.

An integrated automation system may bring data, alarms and commands for several installations together in one supervisory system. The functions remain distinct: monitoring displays condition; an alarm requires attention; control regulates or commands; protection acts on dangerous conditions according to the design. The ship's documentation describes the functions and their dependencies.

The operational decision follows a cycle: verify conditions, prepare the plant and on-call arrangements, begin the UMS period, respond to abnormalities and return to attended operation when needed. A panel without alarms does not by itself demonstrate that all conditions are satisfied.

Regulatory Reference

SOLAS II-1, Part E: regulation 46 addresses equivalent safety, reliability, regular inspections and tests, and documentary evidence of fitness for UMS (§46.3). Regulations 50–53 cover communication, alarms, safety systems and machinery arrangements. Regulation 54 requires specific consideration by the Administration for passenger ships. Institutional SOLAS text consolidated to 2017; corroboration of §§46.2–46.3 in UK guidance MGN 670 Amendment 2, 2026, table 10.

Regulation 51 distinguishes indication in the machinery spaces, connection to engineer officers' accommodation and bridge alarms for situations requiring attention by the officer on watch. If an alarm receives no local attention within the prescribed time, the engineers' alarm is activated. Acknowledgement is not clearance of the fault. Routing, standby power and time delays follow the approved arrangement.

STCW Code A-VIII/2, Part 4-2, §64: in the periodically unattended condition, the designated duty officer shall be immediately available and on call to attend the machinery spaces. Paragraphs 62, 67 and 73–78 address defects, work, records and communication. IMO text of the Manila amendments, 2010. Apply the ship's flag and class requirements, approved instructions, SMS and standing orders: the linked sources have the stated editions and scopes.

Scope of Application

This card concerns ships fit to operate with periodically unattended machinery spaces and the related engineering watch activities. Part E concerns cargo ships, with specific consideration for passenger ships under regulation 54. For passenger ships, the Administration considers whether UMS is permitted and what additional requirements are necessary.

An IAS or class notation does not replace checking documentary evidence of fitness and the authorised conditions. Who may begin or suspend UMS, which checks to perform and when to retain attended operation depend on the ship's arrangements and procedures.

Procedure / How to Complete It

  1. Check whether UMS is permitted. Consult fitness conditions, the SMS and standing orders for the intended situation. Consider plant condition, ship operations, work in progress and available personnel.
  2. Complete the ship's checks. Perform the prescribed rounds and checks; verify the required plant and standby arrangements, alarm and communication systems and the condition of safety systems. Tests follow approved methods and intervals; do not improvise activation of trips or protective functions.
  3. Review defects and work. Make out-of-service equipment, manual operation, isolations and inhibited alarms or protective functions visible. If a necessary UMS condition is lost, retain or restore attended operation and follow the required reporting and authorisation process.
  4. Prepare on-call arrangements and handover. Identify the duty engineer officer and call routing; confirm communication with the bridge. Hand over abnormalities, work and instructions. Record the beginning and end of the period under the SMS and standing orders.
  5. Manage each call. Respond under the procedure, identify the alarm and safely assess the plant. Notify the chief engineer and bridge where required; take the immediate action needed for safety without expecting notification alone to resolve the situation. Assess whether UMS may continue.
  6. Record and restore. Record the event, actions and residual condition, open or update relevant PMS jobs and hand over the information at watch relief. After work, checks and return to service follow the ship's procedures; UMS resumes only when the necessary conditions are satisfied again.

Practical Example

Before the UMS period, a round finds that an alarm channel was inhibited during maintenance. The officer compares the inhibition and open job with the ship's procedural conditions. If the function is necessary for UMS and no permitted alternative arrangement exists, machinery spaces remain attended; the defect is reported and the job stays visible.

After repair, restoration of the channel and the prescribed check are recorded. Entry conditions, on-call arrangements and handover are checked again before beginning UMS. If an alarm then occurs, acknowledging it means taking responsibility for the indication: the fault still needs assessment, action and a decision on continuing unattended operation.

What Typically Goes Wrong

A forgotten inhibition, a defect omitted from handover or a call routed to the wrong person can leave a function without effective supervision. An acknowledged alarm may still represent a fault. Where a necessary condition is lost, continuing UMS without the permitted assessment and arrangements exposes the ship to uncontrolled risk.

Common Mistakes Mistake Library

MistakeConsequenceHow to avoid it
Deciding on UMS solely because the panel shows no alarmsDefects, inhibited safety functions or work may remain invisibleUse the entry procedure and compare actual condition, inhibitions and open jobs
Confusing alarm acknowledgement with restorationThe fault remains active without follow-upSeparate acknowledgement, assessment, action and verification; record residual condition
Not updating the duty officer, call routing or handoverDelayed response or loss of defect informationConfirm the recipient, communication and handover under the ship's arrangements
Improvising daily full tests of all alarms and shutdownsUncontrolled tests or misleading evidence of reliabilityFollow the applicable plan, methods and intervals, retaining results and abnormalities

What the PSCO Checks

Prepare documentary evidence of UMS fitness, authorised conditions, ship procedures and maintenance and test results. The PSCO may compare plant and alarm condition with defects, inhibitions and records, and check crew familiarity with calls and response. More detailed operational controls depend on clear grounds and must respect operational safety. A class notation or completed checklist without evidence of actual condition is insufficient.

Operational Tips

Class note: DNV announced in 2025 that some E0/AUT survey items were moved into main class, stating that technical requirements remained unchanged. An item no longer appearing in the same survey list does not demonstrate that its check has been removed: consult the rules and programme relevant to the ship. DNV announcement, 2 June 2025.

Preparation checklist

FAQ

Does UMS mean there is no engineering watch?
No. The space may be periodically unattended, but the designated duty officer shall be immediately available and on call to attend it. Supervision, rounds, response and records follow the ship's arrangements.
Does SOLAS require daily full tests of every alarm and shutdown?
Part E requires reliability, regular inspections and tests. It does not prescribe a universal daily full test: plans, methods and intervals follow applicable requirements and the approved arrangement. Tests must not be improvised.
Must the engineers' alarm always call the chief engineer?
Connection follows the approved arrangement and designated officer. Duty officer availability is distinct from notifying the chief engineer in the failure, emergency or doubt situations specified by STCW and the ship's arrangements.
Is acknowledging an alarm enough to continue UMS?
No. Acknowledgement takes responsibility for the indication; the fault and ship's conditions need assessment. If a necessary condition is lost and no permitted alternative arrangement is provided, attended operation is retained or restored.

Related Topics

Certified substantive revision: 12 October 2026 · page fingerprint dabe5b838b3e